Brasília Metro
Table of Contents
System map
download (png)
History
Construction to link Brasilia to sites of the Federal District began in 1992, and its first sections started operating in 1999, but because of a backlog of work, the metro was not opened at its originally-scheduled date and time (21 April 1994 at 17:00). Work was finally finished in the beginning of 2001.
Schedule
The Brasilia Metro system operates every day from Monday to Saturday from 6:00 am to 23:30 pm, Sunday and holidays from 7:00 to 19:00. The frequency of the metro is 3 to 22 minutes depending on the season, the day and the schedule. In peak hours, the frequency is 2 to 8 minutes.
Source
Gallery


